01
Identify the plaster work
Record the room, wall or ceiling, material if known, installation or repair dates and any sections completed later. Ask the plasterer or builder to identify different substrates and patched areas.
02
Confirm building readiness
Check roofs, windows, plumbing and known moisture sources are resolved, other wet work is considered and the room can be ventilated and maintained within the product conditions.
03
Inspect and document
Review surfaces in consistent light and photograph exceptions. Where moisture testing is appropriate, use a method and interpretation suitable for the substrate rather than applying one universal reading.
04
Assign remedial work
List cracks, damaged edges, proud repairs, contamination and incomplete junctions. Agree whether the plasterer, carpenter, builder or painter is responsible before decoration starts.
05
Prepare to specification
Follow the selected manufacturer’s instructions for cleaning, de-nibbing, dust removal, primer or first coat, dilution if permitted, drying and recoating. Protect adjacent joinery and finished surfaces.
06
Review the first stage
Inspect the prepared and primed surface before the full finish proceeds. Record unexpected suction, staining, defects or adhesion concerns and agree the response rather than hiding them under further coats.